6. Health & Safety

TYPE MAIN SCHOOL

SIZE

LOCATION Staff Room

ITEM No.

CO2 Water CO2 Water Water Water CO2 Water CO2 Water CO2 Water Water CO2 Foam CO2 Water CO2 CO2 Water CO2 Water CO2 Water CO2 CO2 CO2 CO2 Foam Foam CO2 Foam Water Foam CO2 Foam Water

2kg 6ltr 2kg 6ltr 6ltr 6ltr 2kg 6ltr 2kg 6ltr 2kg 6ltr 6ltr 2kg 9ltr 2kg 6ltr 2kg 2kg 6ltr 2kg 6ltr 2kg 6ltr 2kg 2kg 2kg 2kg 9ltr 9ltr 2kg 6ltr 6ltr 9ltr 2kg 6ltr 6ltr 2kg 2kg 2kg 2kg 2kg 2kg Y Y Y

59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99

Top of main stairs

English corridor staff room end English corridor pool end

o/s Room 30 o/s Room 33 o/s Room 33 o/s Room 34 o/s Room 34 o/s Room 37 o/s Room 38 o/s Room 38 o/s Room 41

South Block Plant Room South Block Plant Room

D2 D3 D3 D3 D4 D4 D5 D3

Fire Blanket

Fire Blanket

o/s Wood Store (corridor) o/s Wood Store (corridor)

D6 D6

Saw Room

D1

B Block Boiler House B Block Boiler House B Block Boiler House Arbor Lodge corridor Arbor Lodge corridor B Block Boiler House Arbor Lodge corridor Arbor Lodge corridor D1

D1 S7

Fire Blanket

CO2 CO2 CO2 CO2 CO2 CO2

Stage Lighting Gantry Library Server Room Design Hub Comms Room Arbor Lodge Small Kitchen

100 101 102 103 104

Room 5

South Block 2 nd floor CL Office

18

Made with FlippingBook Digital Publishing Software